Viewing Feedbacks and Updating Custom Fields
In Engage, changing a feedback needs the Create & Modify Feedbacks permission.
Each feedback has a page of its own in Engage, showing its status, what it costs and what has been paid toward it, how long it has before it is due, and everything that has happened to it. You also change the feedback's details there.
Opening a feedback
- Open the account, select Feedbacks in the sidebar, then select the feedback's reference under Records. The list shows each feedback's Reference, Scheme, Date, Balance, Outstanding and Status.
- Or search for the feedback and select its reference in the results.
What a feedback's page shows
The heading gives the feedback's reference and scheme, with Back to All Feedbacks above it and the ⋯ button beside it, which holds the feedback's options. Below the heading, the page shows the feedback's open tasks, then:
- Paid Date, or Created Date while it is still to be paid; Entered By; and Status.
- How many days are left until the feedback is due, or how many days it is overdue. Point to the figure to see the Timeline: the days left until completion is due, the day number, and the date it was instructed or the days until instruction is due. Until the feedback is paid, this reads Not Started Yet.
- Details: the Scheme, the scheme's own fields, the fund dimensions, Labels and Tags, and the Price, with what has been paid under Donations and what is still to pay under Outstanding.
- Instruction Details, once the feedback is instructed: Instructed Project Code, Instructed Project Name, Instructed Location and Instructed Date.
- Reports: the reports for the donor, with when each is due.
- Ledger: each gift toward the feedback, with its Date, Summary and Amount.
View Log, at the foot of the page, opens the feedback's Log: each stage the feedback has been through, with its date, followed by what it is waiting for next.
Changing a feedback's fields, fund dimensions and price
A pencil icon beside a value on the Details card means it can be changed.
- Select the pencil icon beside one of the scheme's fields to open Update Custom Fields, beside a fund dimension to open Update Fund Dimensions, or beside the price to open Adjust Price.
- Make the change, then select Save, or OK in Adjust Price.
The fields, fund dimensions and price can be changed until the feedback is completed or canceled. Once a feedback is instructed, its fund dimensions stay as they are. A price the scheme fixes cannot be adjusted.
Changing when a feedback is due
Select the ⋯ button beside the heading, then Update Completion Due By or Update Instruction Due By, choose the new date and select Update. Both are there until the feedback is completed or canceled, and Update Instruction Due By until it is instructed.
The feedback's project
The details of the project a feedback is instructed into are kept on the project in Forms rather than on the feedback. To open Forms, select the app switcher at the top of the rail, then Forms, and open the project's Content tab. Projects are described in Creating a Project in Forms.